Hospital Project Confidential

Mission Critical Project, Confidential Hospital Texas
This project include installation of one new 12,000 gallon tank to feed multiple boilers and generators at the location. The main storage tank was installed with a polishing system as well as a remote fill unit due to SPCC requirements.
Other items included were double wall underground piping and required leak detection meeting all Federal, State, and local AHJ approval requirements.
All commissioning and start-up performed as well as a documentation supplied by UST for a complete commissioning script.
All approved engineering and required plans provided by UST Fuel Solutions.