Project Name: Mission Critical South Texas Data Center Owner: Confidential Client/San Antonio Date Completed: August 2014
Project Description: Project included installation of 3-New 30K gallon tanks complete with all controls, pumps, remote fill station equipment, electrical, and required commissioning requirements.
Confidential Client Tier IV Redundant Data Center
Project Name: Confidential Client Tier IV Redundant Data Center Owner: Confidential Client Date Completed: 2012
Project Description: Project included setting of 5-30K UL 2085 gallon tanks including one main quarantine delivery tank. System also included redundant main MCP panels, 6-250 gallon UL 2085 gallon day tanks, 1-new 10K gallon DEF tank for generator, NOX emission controls, and all associated double wall leak detected and heat traced piping. Catwalk and structural steel support systems were engineered and designed by UST. All commissioning and start-up provided as part of an existing legacy data live facility. Final build out of 25 Megawatts.
Metro Health Hospital, Cleveland, OH
Project Name: Metro Health Hospital, Cleveland, OH Project Owner: Metro Health Project Completed: Job in Progress. Scheduled completion 4Q20
Project Description: Project involves installation of three (3) 25K gallon underground storage tanks, remote fill station and fuel polishing system
Construct Fuel Yard
Project Name: Construct Fuel Yard Project Owner: Ft. Hood, Killeen Texas Completion Date: April, 2017
Project Description: Installed two 12,000-gallon fuel tanks and the supporting infrastructure for a new fuel yard. The project called for the installation of one 12,000-gallon gasoline tank and one 12,000-gallon diesel fuel tank (2 total tanks for the project).
The project included:
constructing reinforced concrete footers to support the tanks,
concrete access drives for vehicles to access the fuel pumps,
perimeter security
Fencing, lighting and drainage features (culverts, curbs and berms),
site grading and earthwork to provide for positive drainage,
Start up, testing & commissioning
CAB Hot Refuel Facility, Ft. Bliss
Project Name: CAB Hot Refuel Facility, Ft. Bliss Project Owner: Ft. Bliss Project Completed: July 2013
Project Description: Installation of tanks, piping, controls, valves, new pump skids and commissioning of system. All piping above ground was stainless steel and combined with required regulated underground piping. This was a Hot Cab refueling project allowing instant re-fueling of active helicopters while on the pad and operational.
NAS JRB Ft. Worth, Texas
Project Name: NAS JRB Ft. Worth, Texas Project Owner: Naval Air Station, Ft. Worth Date Completed: September, 2016
Project Description: Upgrade diesel JP-8 and Mogas storage tanks at the vehicle fueling station with new piping, protective exterior coatings, pipe supports, and freeze protection. Included installation of start/stop controls for each pump. Install pre-engineered steel canopy over loading island to cover the equipment for fill-stands including light fixtures, wiring and controls.
Scope also included demolishing of existing pumps and replace with two suction self-priming centrifugal pumps and all electrical work.
Oklahoma National Guard
Project Name: Oklahoma National Guard Project Owner: Oklahoma National Guard Project Completion: October 2007
Project Description: Furnish and install new JP-8 Aviation fueling system complete with all required valves, pumps, motors, tanks, equipment and commissioning of system.
Confidential Client/Backup Generator/Fuel System
Project Name: Confidential Client/Backup Generator/Fuel System Project Owner: Confidential Client Project Completed: April, 2000
Project Description: Installation of new remote fill piping, controls, generator controls, leak detection, installation and commission of all systems.
AT&T Back-up generator/fuel system
Project Name: AT&T Back-up generator/fuel system Project Owner: AT&T Ft. Worth Project Completed: February 2009
Project Description: Furnish and install new underground tank and piping for new generator back-up system. This also included all construction as well as the removal of an existing tank.
Frisco ISD Bus Barn Fleet Fueling System
Project Name: Frisco ISD Bus Barn Fleet Fueling System Project Owner: City of Frisco Project Completed: April 2009
Project Description: Furnish and installation of two new split compartment tanks. Each tank contained diesel and gasoline products. All required above ground piping, underground piping, new dispensing system complete, leak detection, all required electrical, concrete, engineering and commissioning of system.
City of Richardson
Fleet Service Center
Project Name: City of Richardson Fleet Service Center Project Owner: City of Richardson Project Completed: November, 2019
Project Description: Project involved removal of two (2) 10K gallon UST’s and installation of one (1) 30K gallon two-compartment double wall fiberglass coated UST. Scope included all associated piping, and tie-in of new tank monitoring system to existing Veeder Root tank monitor.
Round Rock UPS
Project Name: Round Rock UPS Project Owner: United Parcel Services Project Completion Date: June, 2017
Project Description: Furnish and install three (3) 12,000 gallon fuel tanks, piping, dispensers, leak detection and equipment including galvanized steel ladders and catwalks. Start-up, testing, commissioning and certification.
Consolidated Rental
Car Facility
Project Name: Consolidated Rental Car Facility Project Owner: Bergstrom Airport, Austin, Texas Project Completed: August 2014
Project Description: Three 20k gallon underground storage tanks, piping and 20+ dispensers covering 3 levels of parking garage. Tank monitors, controls and commissioning.
Swift Transportation Fleet Fueling System
Project Name: Swift Transportation Fleet Fueling System Project Owner: Swift Transportation Project Completed: April 2008
Project Description: Furnish and installation of four new 10K gallon above ground storage tanks. All required above ground piping, underground piping, new dispensing system complete, leak detection, all required electrical, concrete, engineering and commissioning of system.
DFW TERMINAL B FUEL HYDRANT PITS
Project Name: DFW Terminal B Fuel Hydrant Pits Project Owner: American Airlines Date Completed: November 2018
Project Description: Project encompassed 14 gates at DFW Airport Terminal B. Included removal and pour back of concrete for hydrant pit tie-ins, fabrication of new hydrant lateral line with new hydrant pits, new pipe, control valves and commissioning.
Love Field Modernization Fuel Project
Project Name: Love Field Modernization Fuel Project Project Owner: Love Field Project Completed: February 2014
Project Description: New hydrant and main fuel lines for new terminal expansion project. Impacted soil and existing piping removal of legacy system for 30 gates.
Robert Gray Airport/Fuel Farm
Project Name: Robert Gray Airport/Fuel Farm Project Owner: Joint Use Robert Gray/Killeen Ft. Hood Regional Airport Project Completion: August 2011
Project Description: Furnish and install new Aviation fuel tanks, valves, pumps, piping, and commission of complete system.